The short version lives on our Packages page — three design tiers, priced per sq.ft of plot area. This is the long version: exactly what's drawn, what's rendered, which software touches your file, and what it takes to get a CMDA stamp on it.
₹28, ₹45 and ₹68 a sq.ft look like three points on a line. They're not — each tier adds a distinct deliverable, not just "more detail." This page lists exactly what's drawn, rendered and filed at each level, so you're picking a scope, not a price point.

| Deliverable | Basic Design₹28 / sq.ft | Complete Design₹45 / sq.ft | Signature Design₹68 / sq.ft |
|---|---|---|---|
| Concept Floor Plans | Up to 3 revisions | Up to 5 revisions | Unlimited within design phase |
| 2D Working Drawings | Included | Included | Included |
| 3D Exterior Elevation Renders | Not included | 3 views | Full walkthrough animation |
| Interior Layout & Furniture Planning | Not included | Included | Included, with material board |
| Structural Drawing Coordination | Included | Included | Included |
| MEP Drawing Coordination | Not included | Included | Included |
| CMDA / DTCP Submission Set | Included | Included + filing follow-up | Included + dedicated liaison |
| Landscape & Facade Lighting Design | Not included | Not included | Included |
| Material & Finish Specification Book | Not included | Not included | Included |
| Vastu Consultation | On request | Included | Included, dedicated session |
| Design Software | AutoCAD, 2D drafting | AutoCAD + SketchUp 3D | AutoCAD + SketchUp + Lumion renders |
| Dedicated Design Project Manager | Not included | Not included | Included |
| Revisions After Sign-off | Chargeable | 1 free round | 2 free rounds |
| Typical Design Timeline | 3–4 weeks | 5–7 weeks | 8–10 weeks |
Plot orientation, soil report and Vastu preferences captured before the first line is drawn.
Floor plans and massing studies, revised with you until the layout earns a sign-off.
Elevations, material palette and 3D renders bring the approved concept to life before drafting.
Construction-issue drawings, structural and MEP coordination finalised for site handoff.
CMDA/DTCP filing tracked to approval, then the full stamped set is handed to your site team.
Applies to plots within Chennai's metropolitan planning limits. Covers setback compliance, floor space index, and building height clearance. We file the complete drawing set and track the application until approval is issued — the stamped copy is yours to keep with the property documents permanently.
Applies to plots outside CMDA limits — most of our villa projects on the GST Road and OMR extension belts fall here. The submission process mirrors CMDA but routes through the local planning authority; timelines vary by district and are quoted upfront once your plot's jurisdiction is confirmed.
Required for any apartment project sold before completion. We prepare the carpet-area calculations, unit-wise drawing set and project timeline documentation that TNRERA registration requires — coordinated directly with our legal team, not outsourced.
A licensed structural engineer certifies the RCC design against STAAD Pro analysis before construction drawings are released to site. This certificate is a prerequisite for CMDA/DTCP approval and is bundled into every design tier, not billed separately.





Browse the gallery, or book a session with a design project manager to scope your plot.