Every tier, down to the TMT bar.

The short version lives on our Packages page — three rates, three tiers. This is the long version: the full specification sheet, the brand names we actually pour and bolt in, the payment milestones, and the checkpoints your site passes through before we hand you the keys.

3
Fixed-Price Construction Tiers
20+
Years of In-House Site Experience
1,850
Starting ₹ / sq.ft, Essential Tier
10
Year Warranty on Prestige Waterproofing
100%
In-House Site Teams, Zero Subcontracted Framing
How To Read This Page

One contract number. Everything it actually buys.

Packages.html gives you the headline rate per tier. This page unpacks that rate line by line — the exact concrete grade, steel brand, tile size and warranty term behind ₹1,850, ₹2,250 and ₹2,850 a sq.ft — so nothing is a surprise when the agreement lands on your table.

  • Full Specification TableEvery material, tier by tier, not just the highlights
  • Brand & Material NamesThe actual mills, cement and fitting brands we specify
  • Payment MilestonesWhat's due at each stage, and what has to be complete first
  • Site CheckpointsWhat's inspected, and by whom, before the next pour
  • Perfect Builders completed apartment exterior
    Tier By Tier

    The full specification sheet, side by side.

    Specification Essential₹1,850 / sq.ft Signature₹2,250 / sq.ft Prestige₹2,850 / sq.ft
    Concrete GradeM25, columns & slabsM30, columns & slabsM30, high-workability mix
    Reinforcement SteelFe500 TMT, secondary millFe500D TMT — Tata / SAIL / JSWFe500D TMT — Tata / SAIL / JSW, corrosion-resistant
    Wall ConstructionAAC block, 6" externalAAC block, 8" externalAAC block, 8" external + acoustic treatment
    FlooringVitrified tiles, 600×600Vitrified tiles, 800×800 + laminate wood bedroomsItalian marble option + engineered wood bedrooms
    Kitchen CounterStandard graniteGranite, branded finishImported granite, quartz option
    DoorsStandard flush doorsTeak-finish veneer doorsSolid teak main door, veneer internal
    WindowsUPVCUPVC + mosquito meshUPVC + mesh, double-glazed option
    PlumbingCPVC, concealedCPVC, concealed, ISI fittingsCPVC, concealed, premium ISI fittings
    ElectricalConcealed copper, MCB DB+ EV charging provision+ home automation pre-wiring
    Bathroom FittingsStandard CP fittingsBranded CP — Jaquar / CeraPremium CP — Jaquar Artize / Kohler
    False CeilingNot includedLiving & diningLiving, dining + cove lighting
    Painting2-coat emulsionPremium emulsion, 2-coatPremium emulsion + texture accent wall
    Structural Warranty2 years5 years10 years
    Waterproofing Warranty5 years7 years10 years
    Site Visits During BuildFortnightly walkthroughWeekly walkthroughWeekly + dedicated project manager
    What Goes Into The Frame

    Brands we actually specify — not "or equivalent."

    Tata Steel / JSW / SAILFe500D TMT reinforcement bars
    UltraTech / ACCOPC 53-grade cement, ready-mix concrete
    Bigbloc / MagicreteAAC blocks, lightweight and thermal-rated
    Kajaria / SomanyVitrified tiles and premium flooring lines
    Finolex / PolycabConcealed copper wiring, fire-retardant grade
    Astral / SupremeCPVC plumbing lines, ISI-marked
    Jaquar / CeraCP fittings, standard to premium lines
    Asian PaintsEmulsion and exterior weatherproof coats
    Our Method

    Five checkpoints your site actually passes through.

    01

    Soil Testing & Foundation Design

    Bore-log analysis before footing design is finalised — no standard footing poured on non-standard soil.

    02

    RCC Frame, Grade Per Tier

    Third-party cube testing on every pour at 7 and 28 days — the reports are yours to keep, not just ours to file.

    03

    Brickwork & MEP Rough-In

    AAC blockwork, concealed copper wiring and CPVC plumbing routed and pressure-tested before walls close.

    04

    Waterproofing & Finishing

    Crystalline treatment on terrace and wet areas, then flooring, paint and fixtures to the sample board.

    05

    Third-Party QA & Handover

    An independent audit signs off before documentation and keys change hands — with your warranty terms attached.

    Payment Milestones

    What's due, and what has to be finished first.

  • Booking & Agreement — 10%Payable on signing the fixed-price construction agreement
  • Foundation & Plinth — 15%Due on completion of foundation RCC and plinth beam
  • RCC Frame to Roof — 35%Released in stages as each floor slab passes cube testing
  • Brickwork & Plastering — 15%Due once blockwork and internal/external plastering is complete
  • MEP & Flooring — 15%Payable on completion of wiring, plumbing and floor tiling
  • Finishing & Handover — 10%Final instalment on fixtures, paint and QA sign-off
  • FAQ

    Construction package questions, answered in full.

    Can I switch tiers mid-construction?
    Yes, up to the start of the finishing stage. Upgrades are quoted as a change order against the remaining scope; the structural work already completed is not re-billed.
    Who tests the concrete, and can I see the results?
    An independent third-party lab tests cubes from every pour at 7 and 28 days. Reports are shared with you directly, not just filed internally — ask your project manager for the folder link at any stage.
    What happens if a payment milestone is delayed on my end?
    Work on the current stage continues to completion, but the next stage doesn't start until the milestone payment clears — this is stated upfront in the agreement, with no penalty interest for reasonable delays.
    Are the brand names in the spec table guaranteed, or "or equivalent"?
    Guaranteed as listed. If a specific brand is out of stock at the time of use, we substitute with a brand of equal or higher listed grade and notify you — never a downgrade without sign-off.
    Does the structural warranty cover cracks from settling?
    Structural warranty covers workmanship and material defects in the RCC frame. Hairline settlement cracks that don't affect structural integrity are common in all construction and are addressed under routine maintenance, not warranty claims.

    Ready to see this priced against your plot?

    Run your built-up area through the cost estimator, or walk an active site with a project manager.